§ 18.20.040. Record and filing.  


Latest version.
  • When a soil report required by Section 18.20.020 has been prepared, such facts shall be noted on the final map or parcel map together with the date of the report and the name of the engineer making the report, and the preliminary soil report shall be filed with the city building official.

(Ord. 88-16 Div. 1 (part), 1988: prior code § 9253.)